Victorian OHS Act 2004 • OHS Regulations 2017 (Part 5.1 HRCW) • WorkSafe Victoria 13 23 60
Victoria OHS & SWMS Compliance Pack for Solar & Electrical Tradies
Under Part 5.1 of the Victorian Occupational Health and Safety Regulations 2017, solar and battery installers working where there is a risk of falling more than 2 metres or working on energised electrical equipment must prepare a written SWMS prior to commencing work.
What's Included in the $79 AUD Flagship Compliance Bundle
- 1. Site-Specific Solar PV & Lithium Battery SWMS (.docx): Step-by-step Hierarchy of Controls for roof access (>2m), DC string isolation, inverter commissioning, and AS/NZS 5139 battery installation.
- 2. Small Contractor WHS Management Plan (.docx): WHS Regulations Part 6.4 governance framework ready for principal contractor pre-qualification.
- 3. Pre-Start Site Safety & Roof Inspection Checklist (.xlsx): 20-point pre-start audit with automated Stop-Work Gate and Compliance Dashboard.
- 4. Toolbox Talk & Worker Sign-Off Register (.docx): Consultation log with Fit-for-Work check and 5 ready-to-use solar/electrical toolbox scripts.
- 5. Lithium Battery (UN 3480) & HazChem Risk Assessment (.docx): Thermal runaway, hydrofluoric acid (HF) gas evacuation, and SDS chemical register.
- 6. Emergency Rescue & Fall-Arrest Plan (.docx): AS/NZS 1891.4 <10-minute suspension trauma rescue and UETDRRF004 LV shock rescue procedures.