Safe Work Australia Model WHS Regulations • AS/NZS 5033 • AS/NZS 5139 • AS/NZS 3000
Solar PV & Lithium Battery Installation SWMS Template (Australia)
Installing rooftop solar PV and stationary lithium-ion battery energy storage systems (BESS) triggers multiple High-Risk Construction Work (HRCW) categories under Australian WHS law: working at heights above 2 metres and work on or near energised electrical installations.
What's Included in the $79 AUD Flagship Compliance Bundle
- 1. Site-Specific Solar PV & Lithium Battery SWMS (.docx): Step-by-step Hierarchy of Controls for roof access (>2m), DC string isolation, inverter commissioning, and AS/NZS 5139 battery installation.
- 2. Small Contractor WHS Management Plan (.docx): WHS Regulations Part 6.4 governance framework ready for principal contractor pre-qualification.
- 3. Pre-Start Site Safety & Roof Inspection Checklist (.xlsx): 20-point pre-start audit with automated Stop-Work Gate and Compliance Dashboard.
- 4. Toolbox Talk & Worker Sign-Off Register (.docx): Consultation log with Fit-for-Work check and 5 ready-to-use solar/electrical toolbox scripts.
- 5. Lithium Battery (UN 3480) & HazChem Risk Assessment (.docx): Thermal runaway, hydrofluoric acid (HF) gas evacuation, and SDS chemical register.
- 6. Emergency Rescue & Fall-Arrest Plan (.docx): AS/NZS 1891.4 <10-minute suspension trauma rescue and UETDRRF004 LV shock rescue procedures.